Net-Metering

Net-Metering

Be sure to work closely with your cooperative for advice and assistance on interconnecting with the grid. They can provide information and history of your energy usage that can help you size your system and evaluate savings. Co-op staff has experience in working with other member-owners and solar contractors. 

YOU MUST GO THROUGH THE GARKANE NET-METER APPLICATION PROCESS TO GET CREDITED FOR YOUR SOLAR PANEL GENERATION

We have seen multiple instances where new solar owners have bypassed the net-metering application process and hooked up their own solar system to the meter. This means the meter was not setup or commissioned to properly read kWh consumption vs kWh generated so all electricity flowing through gets billed as consumption, rather than offsetting the generation from the panels. Part of the net metering approval process is commissioning tests and inspection to confirm that the system isolates/disconnects itself from our system appropriately for safety reasons. So it's a huge safety concern as well as billing concern if the owner of the solar system is planning on getting credited for the energy generated by the solar panels. 

Interested in Net Metering, please download the application and review the requirements. Contact James Clegg our Energy Advisor with questions at 435-261-3988 

Please email application to Taleana Virostko at fsr@garkane.com or drop off at any Garkane office. 

NET METERING Application

*For Net Metering over 25 kW or for a General Service Net Metering application, please contact bryant.shakespear@garkane.com for engineering and application requirements. 

UTAH TARIFF

ARIZONA TARIFF

 

IS ROOFTOP SOLAR RIGHT FOR ME?

It is important to gather as much information as you can in order to make the best decision for your situation.  The following information is available to help our members with the process.